A Story of Trams: From Old to New curated by Karl Meehan

There are two Luas lines, red and green. Tallaght is located on the red luas line. In July 2011, the red line was extended by 4.5km, with five new stops to Saggart. There are presently 32 stops on the red line and 22 on the green line. The Luas lines are currently being extended so that the red and green lines connect. Work on this started in 2013 and is expected to be finished by the end of 2017. You can have a look at the construction of part of the line by clicking on this link. https://www.luascrosscity.ie/construction/works/